Upgraded Secondhand Flat Tape Drawing Machine Industrial Grade Plastic Fiber Production
Descripition:
This upgraded secondhand flat tape drawing machine offers a reliable and efficient solution for producing high-strength polypropylene (PP) or high-density polyethylene (HDPE) flat yarns. Commonly used in the manufacture of woven sacks, FIBC jumbo bags, tarpaulins, and other industrial textiles, this equipment is ideal for manufacturers seeking high output with lower investment costs.
Refurbished to industrial-grade standards, the machine features a high-efficiency extruder, precision T-die, water cooling tank, advanced multi-roller stretching system, and an energy-saving annealing oven. The integrated winding system ensures consistent tape tension and smooth operation for downstream processes such as weaving or lamination.
With adjustable speed and temperature controls via a smart interface, operators can fine-tune settings to achieve optimal tape thickness, width, and tensile strength. Its durable construction, stable performance, and low maintenance needs make it suitable for continuous 24/7 operation in demanding production environments.
The upgraded control system and reinforced mechanical components increase the machine’s lifespan and reduce operational downtime. Whether you're upgrading your current line or adding capacity, this secondhand flat tape drawing system provides a smart balance between performance, reliability, and affordability.
Optional services include on-site installation, operator training, and a full set of spare parts for long-term productivity.
Main technical Datas:
Raw material |
PP/PE |
capacity |
600kg/h |
Main inverter power, brand |
157kw |
Extruder heater power |
67kw |
Photo:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.